Solutions

Rehab Budget & Contractor Management

Build your rehab budget by trade, track every contractor draw against it, and always know exactly how much of your budget is spoken for — quoted, paid, or still available.

Why Rehab Budgets Fall Apart

A rehab budget usually starts clean: a scope of work broken into trades, an estimate for each one, a total that pencils out against your ARV. Then reality sets in. A contractor's quote comes back higher than expected. A "small" electrical issue turns into a full panel upgrade. A draw gets paid before the budget line was ever updated to reflect the actual quote. Three months later, the spreadsheet says one number and your bank account says another.

The problem usually isn't bad estimating — it's that budget, quotes, and payments live in three different places (a spreadsheet, a stack of contractor texts, and a bank statement) and nothing keeps them in sync.

One Rehab Budget, Organized by Trade

FlipMargin structures your rehab budget the way contractors actually quote work — by trade, not as one lump sum. Demo & site prep, foundation & structural, framing, roofing, exterior, windows & doors, HVAC, plumbing, electrical, drywall, flooring, kitchen, bathrooms, interior trim & paint, fixtures & appliances, landscaping, permits, and anything else you need — each trade gets its own budget line, tracked against actual spend as the project moves.

Contractor Draws: Quoted vs. Paid

Most rehab budget tools only count money that's already left your account. FlipMargin counts it differently — and more accurately. The moment you log a contractor's quote for a trade, it counts against that trade's budget immediately, whether or not a dollar has changed hands yet. As draws get paid out against that quote (deposit, mid-project, final), FlipMargin tracks paid vs. quoted separately, so you always know two numbers at a glance: what you've committed to, and what you've actually spent.

This matters because "budget remaining" based only on cash paid out is misleading — it looks healthier than it really is right up until the next invoice lands. Tracking quoted commitments in real time means no surprises at the next draw.

Scope of Work, Turned Into a Live Budget

Every rehab starts with a scope of work — the task-by-task breakdown of what's being done, trade by trade. FlipMargin lets you turn that scope directly into budget line items, so the plan you walked the property with and the numbers you're tracking are the same document, not two things you have to keep reconciling by hand.

Change Orders Without Losing Track

Scope changes are normal on almost every flip — a contractor finds something behind the drywall, or you decide to upgrade a finish. What kills a budget isn't the change order itself, it's forgetting to fold it back into your tracked numbers. Every adjustment to a trade's budget in FlipMargin updates your live profit margin immediately, so a mid-project scope change shows its real impact on your bottom line the same day it happens — not at closing.

From Rehab Budget to Profit Margin

Your rehab budget doesn't exist in isolation — it's one input feeding your overall fix and flip profit tracking, alongside purchase price, holding costs, and selling costs. FlipMargin keeps them connected, so every dollar you commit to a contractor updates your projected profit in real time.

Stop Chasing Contractor Numbers Across Three Places

Track your rehab budget by trade and every contractor draw in one live dashboard. Start your free 7-day trial — no credit card required.

Start Your Free 7-Day Trial

Frequently Asked Questions

Does an unpaid contractor quote count against my rehab budget?

Yes. As soon as you log a quote for a trade, it counts as committed against that trade's budget — whether or not it's been paid yet. This gives you a more accurate "budget remaining" number than tools that only track cash already spent.

Can I organize my rehab budget by trade?

Yes. FlipMargin breaks your rehab budget into individual trades (demo, framing, electrical, plumbing, HVAC, flooring, and more), each tracked against its own quoted and paid amounts.

How do change orders affect my tracked profit margin?

Any adjustment to a trade's budget updates your projected profit margin immediately, so you see the real impact of a scope change the same day it happens rather than discovering it at closing.

Want to see the full feature set? Check out our Features page, read the F.A.Q., or look up terms in our House Flipping Glossary.